Moving ahead

So it’s been a while since beginning news about the workshop and going’s on but unfortunately I was rather busy doing non-Quartet work, but I’m back to it now and I thought I’d give a little update.

The Steamdrone that forms the central set piece of the band’s stage show is a little bigger now and is reaching it’s capacity for pipes and horns and things.  The next phase will be to wire it up which will involve installing pipes to run smoke from a smoke-machine out of the horns and installing lights in the main horns and in the main box of the drone so that we can light it up through the smoke in different patterns. I haven’t figured out what lights will be best to use because I need strong directional lights that are small enough to fit in the the trombone horns (so small than GU10 birdie bulbs).  Suggestions welcome.

The next Quartet project is building the drum kit.  Ed and I went out with a friend, Peter, and scoured a couple of junk lots and metal scrap yards for some appropriately bangin’ junk which will make up about half of the percussion kit.  The other half is made up more conventional percussion instruments like triangles, clapsticks, a floor tom and such.  The bass of the kit will be provided by an old copper boiler which has a really nice boom to it.

So the challenge is to figure out how to organize about 30 different percussion objects so that two people can play at once and then have the ability to move it fairly easily.  I have a feeling that I’m going to need to build a rolling case for most of the instrument parts themselves, but the stand that they are on will be kind of like a clothes-drying rack idea with lots of hooks for hanging things, sitting on top of a table for storing flat objects with the boiler underneath.  The table is now built and looks kind of like a nice coffee table (or will once I paint it).  We found four Victorian carved mahogany coffee table legs at  a junk yard and used them for the base of the table to give it some weight and character.  I think it looks good.  Now I just need to build the rack and make it light enough and strong enough for transport and play, without access to a metal shop.  Welding the rack would be best but without a welder I’m trying to use harder/better quality wood stocks and good joinery techniques to make a lasting piece.

Advertisement

One Response to “Moving ahead”

  1. Bryan C Says:

    Use LEDs not bulbs – they don’t fail and there are lots of different type with a variety of beam angles, colours and brightnesses – you can even get colour changing ones. I can run you up a quick control system too using the same board we used to run the camera arch.

    http://ultraleds.co.uk/

Leave a Reply

Fill in your details below or click an icon to log in:

Gravatar
WordPress.com Logo

Please log in to WordPress.com to post a comment to your blog.

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.